News
MONITOR ELECTRIC AT THE "CIM IN RUSSIA AND THE WORLD — 2026" CONFERENCE

The Sixth International Scientific and Technical Conference «CIM in Russia and the World — 2026» took place in Sochi. Specialists from our company presented the proposed solutions for information exchange, standardisation of data model descriptions, and successful examples of migration to CIM.

The conference was opened by Eduard Sheremettsev, Deputy Minister of Energy of the Russia...

INNOVATIVE SOLUTIONS FOR ENERGY RESOURCE MANAGEMENT AT THE "NEFTEGAZ – 2026" EXHIBITION


Monitor Electric and Unitel Engineering will present advanced solutions for the digitalisation of dispatch centres in the oil and gas sector and industrial enterprises at their joint booth at the international exhibition «Neftegaz – 2026.»

Visitors to the booth will be introduced to a dispatch system that provides real-time data collection from both telemechanics systems and...

CONTROL OF TRANSFORMER CURRENT LOADING HAS BECOME MORE PRECISE

The CK-11 information model now includes the ability to specify the time required for transformer recovery after overload. As is well known, the recovery time depends on the cooling system type and affects the permissible duration of current loading.

This new parameter has been incorporated into the algorithm of the Current Load Monitoring subsystem, which is part of CK-11....

NEW ATTRIBUTE FOR EQUIPMENT OUTAGE REQUESTS — WITH DE-ENERGISED CONSUMERS

Searching for requests involving work accompanied by power supply interruption to consumers has become easier. A new attribute — «With de-energised consumers» — has been added to the request card.

The attribute can be set and removed during request creation and review. When specified in the repair schedule, it is automatically transferred to the request created on the basis...

VOICE INPUT OF DISPATCHER COMMANDS HAS BECOME A REALITY

The first stage of development of the CK.ASR module, which enables automatic transcription of operational communications using artificial intelligence, has been completed.

CK.ASR records received reports and messages into the electronic Operational Log without manual entry. Thus, AI eliminates the loss of information obtained during operational communications and improves t...

INTERLEVEL INFORMATION EXCHANGE SIMULTANEOUSLY WITH MULTIPLE SYSTEMS BASED ON CK-11

CK-11 now supports the use of domains and domain groups as nodes within the communication network and the corporate operational information exchange network. This enhancement enables dispatch centres to transmit model, log, and operational data simultaneously to multiple domains within a single organisation.

Communication channels and other objects related to responsibility...

ENTERING OPERATIONAL LIMITS HAS BECOME EVEN EASIER

New capabilities have been added to the CK-11 information model creation and editing tools, simplifying equipment model maintenance and reducing the risk of errors.

For transformers, an option has been implemented for automatic addition of the current versus OLTC (on-load tap-changer) position curve to operational limits. Dependency curves can now be automatically linked to...

MONITOR ELECTRIC TO PRESENT ON PROSPECTS AND BEST PRACTICES OF INFORMATION EXCHANGE IN THE POWER INDUSTRY

Experts from Monitor Electric will speak at the Sixth International Scientific and Technical Conference «CIM in Russia and the World – 2026,» to be held on 5–6 February in Sochi. Specialists will present proposed solutions for information exchange, standardisation of data model descriptions, and successful migration cases to CIM.

Head of Generation Projects Department Anast...

AUTOFLISR AUTOMATIC POWER RESTORATION SERVICE PROVES ITS EFFECTIVENESS IN PILOT OPERATION

At one of the distribution grid districts of Rosseti Lenenergo PJSC, pilot operation of the AutoFLISR application has been completed. The service underwent testing in real-world conditions for over a year and has now been transitioned to full-scale industrial operation.

In the event of power grid equipment tripping due to relay protection operation, AutoFLISR autonomously i...

OPTIMISED PROCESSES FOR APPROVAL AND CANCELLATION OF REQUESTS FROM EXTERNAL SYSTEMS

System settings have been added to the CK.Outage Requests system to optimise request cancellation and approval processes. The request approval mechanism when working with external systems has been improved: account is now taken of future approval information when generating a dynamic route for a request received from an external system. A similar option has been implemented for request t...

DETAILED STATISTICS ON EQUIPMENT REPAIRS NOW AVAILABLE IN CK.OUTAGE REQUESTS

A new «Statistics» tool enables analysis of the duration of various equipment repair types based on approved requests for a selected period. The analysis breaks down by work type in convenient units of measurement (hours or days). Any period and equipment composition can be selected.

The new tool also allows visibility into the duration of equipment in operation for future ...

SUPPORT FOR ESM DEVICES ADDED TO CK.ADVANCED METERING HES

Support for polling ESM devices has been added to the CK.Advanced Metering HES energy resource metering subsystem. Functions for collecting current readings, archive readings (as of the beginning of the day), power profiles, and instantaneous values of electrical parameters are now available.

The ESM device combines a three-phase multi-tariff commercial electricity meter, a...


Для корректной работы сайта поверните устройство вертикально