24.02.2026

CONTROL OF TRANSFORMER CURRENT LOADING HAS BECOME MORE PRECISE

The CK-11 information model now includes the ability to specify the time required for transformer recovery after overload. As is well known, the recovery time depends on the cooling system type and affects the permissible duration of current loading.

This new parameter has been incorporated into the algorithm of the Current Load Monitoring subsystem, which is part of CK-11. This enhancement enables the consideration of equipment operating characteristics when dispatchers monitor current loading.

Для корректной работы сайта поверните устройство вертикально