Monitor Electric is developing an experimental solution for automatic recording of operational communications, based on the application of artificial intelligence technologies.
The traditional method of manually recording the content of operational communications not only slows down the process of maintaining technological documentation but also increases the risk of losing critica...
On 6–7 February, Monitor Electric took part in the fifth annual conference «CIM in Russia and the World,» held in Sochi. The event brought together professionals from leading energy companies, software manufacturers, representatives of research institutes, and international experts for the purpose of exchanging best practices in implementing CIM technologies in energy companies and developing a...
From 3 to 5 December, Monitor Electric took part in the annual international forum «Electric Networks – 2024,» an event that unites thousands of specialists from the electric power and electrical engineering industries, scientific experts, government representatives, design organisations, and system integrators.
Traditionally, at this event, Monitor Electric presents its latest dev...
Specialists of Monitor Electric and Astra Group have completed a series of certification activities for the current release of the CK-11 software under the Ready for Astra technology partnership programme. The expert review confirmed that the CK-11 platform is fully compatible with the domestic DBMS Tantor version 15.
The certification included functional and load testing, the resu...
In May 2024, specialists of Monitor Electric JSC and AMT-GROUP JSC completed testing of unidirectional telemetry data transfer tools between СК-11 via the «AMT InfoDiode» suite (AMT-GROUP JSC), which ensures physical segregation of network segments with different trust levels while preserving the required functionality for interoperability with adjacent information systems.
...
From March 19 to 21, a delegation from Monitor Electric JSC took part in the IX International Forum «Seymartec Energy. Power Supply and Energy Efficiency in Mining, Metallurgy, Mechanical Engineering, Power Generation, and the Oil & Gas Industry – 2024» in Chelyabinsk.
The business program was attended by over 300 representatives of major industrial companies from Russia and abroad...
On February 8–9, a delegation from Monitor Electric took part in the fourth annual International Scientific and Technical Conference «CIM in Russia and the World – 2024.» The event, organized by SO UES JSC with the support of the Ministry of Energy of the Russian Federation, brought together about 200 professionals from major energy companies, research institutes, software and IT solution vendo...
The deployment of CK-11 at the energy dispatching center of Gazpromneft-Khantos LLC has been completed, with integration into the unified Grid Control Center (CUES) of Gazpromneft Energy Systems LLC, which was opened in Tyumen in 2022.
During the project, the team of Monitor Electric JSC, together with contractors and employees of Gazprom Neft Group, successfully deployed a...
In 2023, the first stage of deployment of CK-11 platform software was completed at the energy dispatching center of the Messoyakha group of fields, located 250 kilometers from the Arctic Circle in the Arctic climate zone.
Over the course of three years, despite the logistics challenges caused by the pandemic, the team of Monitor Electric JSC, together with contractors and employees...
On December 20, 2023, the CK.Outage Requests software, the request management system, successfully passed testing for the exchange of equipment outage requests between the Smolensk NPP branch of Rosenergoatom Concern JSC and the Central ODU branch of SO UPS JSC.
CK.Outage Requests is a software product that fully automates the business processes of managing requests for taking plan...
In December 2023, automated operational documentation systems running on the CK-11 platform were successfully put into commercial operation at Phosphorit Industrial Group LLC and EuroChem North-West JSC, both located within the Phosphorit industrial zone in the Kingisepp District of Leningrad Oblast.
The automation of operational documentation management required adapting the CK-11...
In December 2023, specialists from Monitor Electric and Postgres Professional conducted joint load testing of the current (16th) version of the Postgres Pro Standard database management system when used with CK-11, the domestic platform for building automated dispatch, process, situational, and commercial management systems for electric power facilities. During the testing, a specialize...