30.12.2021
FIRST STAGE OF CK-11 DEPLOYMENT COMPLETED AT TULENERGO
At the end of November, Monitor Electric completed the first stage of CK-11 deployment at the Unified Grid Control Center (UGCC) of Tulenergo.During 2020, Tulenergo employees independently built a digital information model of the electric network in CK-11 with remote support from Monitor Electric engineers. The network information model comprises more than 12,000 transformer substations and distribution points.
Today, the UGCC operates SCADA functions, current load monitoring, voltage level monitoring, automated switching forms, as well as an electronic operational logbook and a work permits and orders logbook.
The use of CK-11 at Tulenergo's new control center has made it possible to bring together all operational and technological personnel within a single digital information environment and to confidently embark on the path of digitalizing operational and technological management of electric networks.