OPERATIONAL TESTING OF SCADA/EMS CK-2007 AT TGC-8 PLANTS
Operational testing of telemetric and communication systems at TGC-8, JSC is underway.
The core of the systems installed at objects of TGC-8 is state-of-the-art SCADA/EMS CK-2007 version 7.1, turned on in the mode without "central transmitter-receiver station" for data collection from measuring devices of the lower level ION, WAGO via Modbus protocol and new data retransmission into control centers of SO-CDU branches.
Compact, efficient, modern solution on the basis of SCADA/EMS CK-2007 and multifunctional measuring converters is now the best choice for telemetric and automation systems construction, providing wide range of opportunities with minimum requirements to infrastructure and maintenance personnel at the automation object.